Air 2 Streamlined Squad(s)

Air 2 Streamlined Squad(s)

Description

I Had Just Changed Over My Air 2 To Be Bowden (I Gained Z Room From 90Mm To 134Mm), And I Found That The M4 Screw Heads Were Getting Caught On The Hot End Wires Coming From The X-Carriage. So I Used Mecano'S Drawings To Re-Create The Squad Brackets, Except I Inset The Allen Heads, And Cut Chamfers Into The Edges Of The Squads. Now, I Can Have The X-Carriage Move Back And Forth Without Wires Getting Caught On The Squads Or The Screws.

Statistics

Likes

4

Downloads

0