Temp Tower 10 Stages
Description
Here Is A Quick And Dirty Temp Tower Test I Created. The Gcode Includes A Start And End Script You Might Not Want But Has The Temperatures Set To 180 - 225 In 5 Degree Increments. Includes: 12Mm Bridge 12Mm Semi Circle Arch 45 Deg. Triangle Over Hang. 0.5Mm Cylinder (Spike) 0.25Mm Cylinder (Spike) I'Ve Included The Freecad Files. This Is My First Thing So I Hope Someone Likes It.
Statistics
Likes
33
Downloads
0